Choose a state

C-1G Pipes and Vents for Gas Contractor (2022-10-04)

The installation of pipes from the source of supply of liquefied petroleum and natural gas into a building or structure and the installation of the related vents.

50 Questions
70% Minimum Passing Score
2 Hours,

The reference material listed below was used to prepare the questions for this examination.  The examination may also contain questions based on trade knowledge or general industry practices. Except for Code books, you can base your answers on later editions of references as they become available.  For Code questions, the examinations will be based only on the edition of the Code book that is listed.

These products apply to test outline dated 2022-10-04

Click Here to View the Candidate Information Bulletin Click Here to View the Candidate Information Bulletin



Open Book These books are allowed while taking your test.
Closed Book These books are for pre-test study only and are not available for use during the test.
In Stock These books are currently in stock.
Out of Stock These books are currently out of stock.

  • Open Book In Stock

    Blank Quick Reference Tabs

    $13.00

  • Open Book In Stock

    NFPA 54: National Fuel and Gas Code 2012 Edition

    Publication Year: 2012

    $150.00

    2012 NFPA 54: National Fuel Gas Code provides revised, industry accepted guidance for the safe installation and operation of gas piping systems, appliances, equipment, and accessories.

  • Open Book In Stock

    Uniform Mechanical Code 2012

    $115.00

    Uniform Mechanical Code 2012 provides complete requirements for the installation and maintenance of heating, ventilating, cooling and refrigeration systems, while at the same time allowing latitude for innovations and new technologies.

  • Open Book In Stock

    NFPA 58: Liquefied Petroleum Gas Code 2014

    Publication Year: 2014

    $150.00

    Liquefied Petroleum Gas Code provides minimum safety requirements for all liquefied petroleum gas (propane) installations, from small cylinders installed at residences to large bulk storage facilities that can exceed 100,000 gallons. The code includes minimum requirements for safe handling during LP gas transfer, including operator qualifications, maximum filling quantity in containers, and pre-transfer inspections to ensure containers are fit for continued service.