Choose a state
CR-41 Septic Tank and Systems (Residential/Commercial) (2019-01-02)
Installation and repair of sewage treatment systems, septic tanks, cesspools and leach fields, in compliance with the requirements of the responsible Health Departments. This scope includes the CR-41R subclassification.
Installation, alteration and repair of septic tanks, aerobic digesters and leaching fields, excavation for tanks, leaching systems and piping, pipe laying for septic systems and connection to the structure the system services. Also included is backfilling and compaction in connection with this work.
60 Questions
70% Minimum Passing Score
150 Minutes Time Allowed
The reference material listed below was used to prepare the questions for this examination. The examination may also contain questions based on trade knowledge or general industry practices. Except for Code books, you can base your answers on later editions of references as they become available. For Code questions, the examinations will be based only on the edition of the Code book that is listed.
These products apply to test outline dated 2019-01-02
Click Here to View the Candidate Information Bulletin
Closed Book These books are for pre-test study only and are not available for use during the test.
-
Open Book
On-site Wastewater Treatment Facility Provisions in Unified Water Quality Permit Rule, AZ Admin Code, Title 18, Chapter 9
Publication Year: 2006
$18.47
-
-
Closed Book
Arizona 811: Arizona Blue Stake Inc (English)
July Edition
Publication Year: 2010
This booklet was published with the intent of assisting the excavator utilizing the special services of Blue Stake. It is not intended to be used as an interpretation of state law or as an industry standard. This booklet will be revised from time to time without notice.
-
Open Book
International Plumbing Code 2018
Publication Year: 2018
$93.00
The IPC provides minimum regulations for plumbing facilities in terms of both performance and prescriptive objectives, and provides for the acceptance of new and innovative products, materials, and systems. Important changes include: Updated table for the Minimum Number of Required Plumbing Fixtures. Single-user toilet facilities (a room having a single water closet and a single lavatory) are not required to be labeled for use by only a male or female (separated use designations). Solar thermal water heating systems need to conform to the ICC 900/SRCC 300 standard. Well systems are required to comply with standard NGWA-01 where local requirements do not cover subject matter or are lacking in detail on others.
-
Open Book
International Plumbing Code Turbo Tabs 2018
Publication Year: 2018
$15.62
2018 IPC Turbo Tabs consist of clear plastic self-adhesive tabs that have key sections of the 2018 International Plumbing Code printed on them in an easy-to-read format. Can be used with either the 2018 International Plumbing Code or the 2018 IPC Code and Commentary.
-
Closed Book
Pipe and Excavation Contracting 2011
Publication Year: 2011
$50.00
This popular manual has been updated and improved to bring it more current with modern earth moving and trenching equipment, refined excavation techniques, stricter safety rules, and improved materials. Here you’ll find how to enter and succeed in the underground utility business. Includes hands-on instructions for operating the equipment and doing the trenching, pipe laying and connecting work and answers to what causes so many skilled equipment operators and pipe layers to fail when they try to start their own business.
-
Open Book
Code of Federal Regulations, 29 CFR Part 1926 (OSHA) 2023
$29.50
All Federal Construction Regulations (29 CFR 1926) are included in this “perfect bound” book in an easy-to-read, two-color layout.
All 29 CFR 1926 regulations for construction industry are included along with the following items:
29 CFR 1903 regulations covering inspections, citations, and penalties
29 CFR 1904 regulations covering recording and reporting occupational injuries and illnesses
OSHA keyword dictionary
Easy to find OSHA interpretations